Takeoffs, Estimates and Project Management.
All in one estimeno app.
Multi-device software for Builders, Quantity Surveyors, Architects and Investors - create estimates, manage project costs and track valuations from start to finish.
Creating Project
Set the location to get local weather and regional rates for accurate pricing.
Upload plans
Scan a drawing or upload a PDF to the project Files or Board.
Floor slab28.00 m² · £2 710.40
Cavity wallLength 16.20 m × Height 3.00 m = 48.60 m² · £8 578.90
Scaffolding4.40 m × 3.00 m = 13.20 m² · £244.20
Skip hire 8 yd1 nr · £310.00
Collaboration like in a game
Invite your team to your project sandbox to play around and stay in touch.
Take measurements
Measure and watch the results update live.
Work together
Everyone sees every change at the same time.
Bring plans to life
Visualise and understand your project better to price it correctly.
1.2 Cavity wall
1.3 Scaffolding
1.4 Skip hire 8 yd

1.2 Cavity wall
Total : £8 578.90
Materials
Facing bricks2916 bricks
£2 770.20
Blocks 100 mm486 blocks
£1 020.60
PIR insulation 100 mm52 m²
£738.40
Wall ties122 ties
£103.70
Mortar5 bags
£42.50
Labour
Bricklayer73 hours
£2 482.00
Labourer42 hours
£1 008.00
Equipment
Mortar mixer8 days
£304.00
Power tools73 hours
£109.50
Estimate in seconds
Get an instant price with built-in 1,000+ ready-to-use items.
Risk assessment
Morland Avenue, Croydon
1.3 ScaffoldingWork at height - erected and tagged by CISRS scaffolders, inspected weekly.
1.2 Cavity wallManual handling - blocks max 20 kg, mortar on a stand at waist height.
Method statement
Morland Avenue, Croydon
1.1 Floor slabPour in one day, cure 7 days, no loads or traffic on the slab.
1.4 Skip hire 8 ydOn hardstanding, council permit if on the road, covered after hours.
H&S policy
Morland Avenue, Croydon
PPE on site at all times
First aid kit and welfare in the garden
Toolbox talk every Monday
Page 1 / 3 · First Page
Estimate for Quote for Partner
House Extension
CR0 6PQ, Morland Avenue, Croydon
hello@yourcompany.co.uk
Calculations
1.1 Floor slab
28 m²
£96.80
£2 710.40
1.2 Cavity wall
48.6 m²
£176.52
£8 578.90
1.3 Scaffolding
13.2 m²
£18.50
£244.20
1.4 Skip hire 8 yd
1 nr
£310.00
£310.00
Net£11 843.50
Overheads and profit 15%£1 776.53
Contingency 3%£408.60
VAT 20%£2 805.73
Total£16 834.35

1.2 Cavity wall (48.6 m²)
set manually
‹ October 2026 ›
1.4 Skip hire 8 yd
8
9
10
11
12
13
1.1 Floor slab
14
15
16
17
18
19
20
21
22
1.3 Scaffolding
23
24
25
26
1.2 Cavity wall
27
28
29
30
Handover
31
1
A.W · Investor
Quick one on the cavity wall - can we swap to a lighter facing brick?
T.F · BuilderYes, same rate per m² - the valuation stays as it is.
Edit documents together
No more emailing PDFs and waiting for approval - agree on it together, live.
Generate RAMS
Save hours on paperwork with ready-made templates.
Schedule of Works
Organise your daily agenda.
Progress-based Valuations
Always know exactly how much the client should pay.
Integrated Chat
Every change to the project agreed in one place.
estimeno
Everything you've seen above - and many more features - in one app.
Trusted by Builders, Architects, Investors
Join to stay organised and work faster.
The updated system is much more efficient, user-friendly, and has made preparing quotes for my clients so much easier and faster.
The software is intuitive and easy to use, and the recent major overhaul has significantly improved its functionality and user experience.
Always fast and efficient, nothing is a problem — the app is nice and easy. Excellent!
The app is very easy to use, even for someone busy on-site who needs quick and accurate estimates without wasting time. The interface is clean, professional, and everything is simple to navigate.
Software is easy to use, it's nearly navigate you by it self. It's much easier, faster and better than the previous version.